{"id":5656,"date":"2018-09-06T21:15:56","date_gmt":"2018-09-06T19:15:56","guid":{"rendered":"https:\/\/www.palfinger-srbija.rs\/2018\/09\/06\/superstructures-with-bodies-for-jkp-vodovod-i-kanalizacija-novi-sad\/"},"modified":"2026-03-23T13:50:27","modified_gmt":"2026-03-23T12:50:27","slug":"superstructures-with-bodies-for-jkp-vodovod-i-kanalizacija-novi-sad","status":"publish","type":"post","link":"https:\/\/www.palfinger-srbija.rs\/en\/2018\/09\/06\/superstructures-with-bodies-for-jkp-vodovod-i-kanalizacija-novi-sad\/","title":{"rendered":"Superstructures with Bodies for JKP Vodovod i Kanalizacija Novi Sad"},"content":{"rendered":"\n<p>The public utility company \u201cVodovod i Kanalizacija\u201d Novi Sad received three Iveco Daily 35S12 vehicles with <a href=\"http:\/\/palfinger-srbija.rs\/portfolio\/kamionski-sanduci\/\" target=\"_blank\" rel=\"noreferrer noopener\">box bodies<\/a> and tarps, manufactured and installed at Palfinger Serbia facilities. The vehicles will be used for daily maintenance and servicing of the water supply and sewerage network in the city of Novi Sad. Each box body is custom-built to the client\u2019s specifications, with high-quality craftsmanship and durable materials ensuring long-lasting performance and reliability.  <\/p>\n\n<p>The public utility company \u201cVodovod i Kanalizacija\u201d was established by the Assembly of the City of Novi Sad with the purpose of producing and distributing drinking water, as well as collecting and treating wastewater.<\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-1 wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"750\" data-id=\"1890\" src=\"http:\/\/dev.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-5.jpg\" alt=\"\" class=\"wp-image-1890\" srcset=\"https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-5.jpg 1000w, https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-5-300x225.jpg 300w, https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-5-768x576.jpg 768w, https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-5-600x450.jpg 600w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"750\" data-id=\"1889\" src=\"http:\/\/dev.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-4.jpg\" alt=\"\" class=\"wp-image-1889\" srcset=\"https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-4.jpg 1000w, https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-4-300x225.jpg 300w, https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-4-768x576.jpg 768w, https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-4-600x450.jpg 600w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"750\" data-id=\"1887\" src=\"http:\/\/dev.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-2.jpg\" alt=\"\" class=\"wp-image-1887\" srcset=\"https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-2.jpg 1000w, https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-2-300x225.jpg 300w, https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-2-768x576.jpg 768w, https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-2-600x450.jpg 600w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"1000\" height=\"750\" data-id=\"1886\" src=\"http:\/\/dev.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-1.jpg\" alt=\"\" class=\"wp-image-1886\" srcset=\"https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-1.jpg 1000w, https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-1-300x225.jpg 300w, https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-1-768x576.jpg 768w, https:\/\/www.palfinger-srbija.rs\/wordpress\/wp-content\/uploads\/2025\/10\/vodovod-kanalizacija-novi-sad-iveco-daily-1-600x450.jpg 600w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>The public utility company \u201cVodovod i Kanalizacija\u201d Novi Sad received three Iveco Daily 35S12 vehicles with box bodies and tarps, manufactured and installed at Palfinger Serbia facilities. The vehicles will be used for daily maintenance and servicing of the water supply and sewerage network in the city of Novi Sad. Each box body is custom-built [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5655,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[333],"tags":[464],"class_list":["post-5656","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-deliveries","tag-tarped-box-body"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.palfinger-srbija.rs\/en\/wp-json\/wp\/v2\/posts\/5656","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.palfinger-srbija.rs\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.palfinger-srbija.rs\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.palfinger-srbija.rs\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.palfinger-srbija.rs\/en\/wp-json\/wp\/v2\/comments?post=5656"}],"version-history":[{"count":1,"href":"https:\/\/www.palfinger-srbija.rs\/en\/wp-json\/wp\/v2\/posts\/5656\/revisions"}],"predecessor-version":[{"id":5657,"href":"https:\/\/www.palfinger-srbija.rs\/en\/wp-json\/wp\/v2\/posts\/5656\/revisions\/5657"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.palfinger-srbija.rs\/en\/wp-json\/wp\/v2\/media\/5655"}],"wp:attachment":[{"href":"https:\/\/www.palfinger-srbija.rs\/en\/wp-json\/wp\/v2\/media?parent=5656"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.palfinger-srbija.rs\/en\/wp-json\/wp\/v2\/categories?post=5656"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.palfinger-srbija.rs\/en\/wp-json\/wp\/v2\/tags?post=5656"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}